Boy, this is a tough area to clear by hand. We entered the water all togged up to find ourselves struggling with the depth of silt. Some (me included) had to give up as it proved too much. However, the guys did an amazing job cutting at the overgrown bushes and trees that have been blocking the canal for quite some time.
We were unable to finish the work in the time allowed, so we now plan a revisit next Monday to tackle the remaining branches. It is already looking so much better.